EXPORT_NOT_READY Export not ready
- HTTP status
409- Credit
- No credit taken
Meaning
The export is still being built, or building it failed. The file was requested before the status became ready.
Fix
Poll GET /api/audit/exports/{export_id} until status is READY; if it is FAILED, create a new export.
Example response
{
"type": "https://checkslip.com/problems/export-not-ready",
"title": "Export not ready",
"status": 409,
"code": "EXPORT_NOT_READY",
"instance": "0192d4a8-7c1e-7b3a-9f20-5c8e1d2a4b6f"
}